Project Management: Tools & Techniques

Luckily, task management tools are designed for this, acting as a safeguard against going crazy! It's a dedicated space to monitor your task progress, assign tasks, and manage schedules. It ensures that you're able to efficiently track tasks and subtasks so that you meet your deadlines. Task management is more than a to-do list. It means tracking tasks from beginning to end, delegating subtasks to teammates, and setting deadlines to make sure projects get done on time. Task management software, like Asana, empowers teams to work more productively and efficiently.

Sean Maserang

MSIS 488: Systems Analysis & Design

Fall 2002

Introduction | Projects | Project Management | Tools | The Future | References

Introduction

Problems arise in every organization. Such problems as what products/systems to develop, should capacity be expanded, or should a computer be purchased are just a few of an endless number of continuing problems about which management must concern itself if the firm is to survive. These problems and their alternative solutions establish some elements of change around which the organization must adapt. Projects are generally established to carry out these changes and someone is always responsible for each project's successful completion.[11]

Every project is unique in terms of the problems that arise, the priorities and resources assigned it, the environment in which it operates, and the project manager's attitude and style used to guide and control project activities. Therefore, the organizational structure for the project must be designed to fit within that project's operating constraints. The organizational structure implemented may not be the same structure used throughout the life cycle of the project due to changes in priorities, available resource, project personnel, laws, and other contingencies. Regardless of the project management structure chosen, management must realize that a dynamic state of equilibrium between limited personnel and financial resources and the objectives of the project will be necessary if project management is to be successful in their particular organization.[11] Before touching on the major tools and techniques of project management, let's get to the bottom of what project management truly is. Later, I will list the benefits that the tools and techniques of project management bring to the systems analysis process.

Projects

Nearly every activity within an organization could be labeled as a project possessing unique characteristics and varying levels of importance to the organization. A project is defined as a planned undertaking of related activities to reach an objective that has a beginning and an end.[16] All projects solve some type of problem, but projects may also be established simply to determine and define feasible alternative solutions to problems. Seven primary characteristics of a project include:[11]

  1. Objective: Each has a specific goal to reach.
  2. Schedule: Point in time in which they must be accomplished.
  3. Complexity: Does the technology exist to achieve the project objectives?
  4. Size and Nature of Task: Step-by-step plan of action.
  5. Resources: Labor, personnel, equipment, materials, facilities, etc.
  6. Organizational Structure: The 'meshing' of project requirements into the existing organization.
  7. Information and Control Systems: These must be structured to handle problems through the typical lines of authority (Prin. of Project Mgmt).

Project Management

In the past, a company typically decided to undertake a project effort, assigned the project and the 'necessary' resources to a carefully selected individual and assumed they were using some form of project management. Organizational implications were of little importance. Although the basic concepts of project management are simple, applying these concepts to an existing organization is not. Richard P. Olsen, in his article 'Can Project Management Be Defined?' defined project management as '…the application of a collection of tools and techniques…to direct the use of diverse resources toward the accomplishment of a unique, complex, one-time task within time, cost, and quality constraints. Each task requires a particular mix of these tools and techniques structured to fit the task environment and life cycle (from conception to completion) of the task.' [11]

Employing project management technologies minimizes the disruption of routine business activities in many cases by placing under a single command all of the skills, technologies, and resources needed to realize the project. The skills required depend on each specific project and the resources available at that time. The greater the amount of adjustments a parent organization must make to fulfill project objectives, the greater chance exists for project failure. The form of project management will be unique for every project endeavor and will change throughout the project.[11]

The project management process typically includes four key phases: initiating the project, planning the project, executing the project, and closing the project. An outline of each phase is provided below.

Initiating the Project
The project management techniques related to the project initiation phase include: [16]

  1. Establishing the project initiation team. This involves organizing team members to assist in carrying out the project initiation activities.
  2. Establishing a relationship with the customer. The understanding of your customer's organization will foster a stronger relationship between the two of you.
  3. Establishing the project initiation plan. Defines the activities required to organize the team while working to define the goals and scope of the project.
  4. Establishing management procedures. Concerned with developing team communication and reporting procedures, job assignments and roles, project change procedure, and how project funding and billing will be handled.
  5. Establishing the project management environment and workbook. Focuses on the collection and organization of the tools that you will use while managing the project.

Planning the Project
The project management techniques related to the project planning phase include:[16]

  1. Describing project scope, alternatives, and feasibility. The understanding of the content and complexity of the project. Some relevant questions that should be answered include:
    • What problem/opportunity does the project address?
    • What results are to be achieved?
    • What needs to be done?
    • How will success be measured?
    • How will we know when we are finished?
  2. Divide the project into tasks. This technique is also known as the work breakdown structure. This step is done to ensure an easy progression between tasks.
  3. Estimating resources and creating a resource plan. This helps to gather and arrange resources in the most effective manner.
  4. Developing a preliminary schedule. In this step, you are to assign time estimates to each activity in the work breakdown structure. From here, you will be able to create the target start and end dates for the project.
  5. Developing a communication plan. The idea here is to outline the communication procedures between management, team members, and the customer.
  6. Determining project standards and procedures. The specification of how various deliverables are produced and tested by the project team.
  7. Identifying and assessing risk. The goal here is to identify potential sources of risk and the consequences of those risks.
  8. Creating a preliminary budget. The budget should summarize the planned expenses and revenues related to the project.
  9. Developing a statement of work. This document will list the work to be done and the expected outcome of the project.
  10. Setting a baseline project plan. This should provide an estimate of the project's tasks and resource requirements.

Executing the Project
The project management techniques related to the project execution phase include:[16]

  1. Executing the baseline project plan. The job of the project manager is to initiate the execution of project activities, acquire and assign resources, orient and train new team members, keep the project on schedule, and assure the quality of project deliverables.
  2. Monitoring project progress against the baseline project plan. Using Gantt and PERT charts, which will be discussed in detail further on in this paper, can assist the project manager in doing this.
  3. Managing changes to the baseline project plan.
  4. Maintaining the project workbook. Maintaining complete records of all project events is necessary. The project workbook is the primary source of information for producing all project reports.
  5. Communicating the project status. This means that the entire project plan should be shard with the entire project team and any revisions to the plan should be communicated to all interested parties so that everyone understands how the plan is evolving.

Closing Down the Project
The project management techniques related to the project closedown phase include:[16]

  1. Closing down the project. In this stage, it is important to notify all interested parties of the completion of the project. Also, all project documentation and records should be finalized so that the final review of the project can be conducted.
  2. Conducting post project reviews. This is done to determine the strengths and weaknesses of project deliverables, the processes used to create them, and the project management process.
  3. Closing the customer contract. The final activity is to ensure that all contractual terms of the project have been met.

The techniques listed above in the four key phases of project management enable a project team to:[3]

  • Link project goals and objectives to stakeholder needs.
  • Focus on customer needs.
  • Build high-performance project teams.
  • Work across functional boundaries.
  • Develop work breakdown structures.
  • Estimate project costs and schedules.
  • Meet time constraints.
  • Calculate risks.
  • Establish a dependable project control and monitoring system.

Tools

Project management is a challenging task with many complex responsibilities. Fortunately, there are many tools available to assist with accomplishing the tasks and executing the responsibilities. Some require a computer with supporting software, while others can be used manually. Project managers should choose a project management tool that best suits their management style. No one tool addresses all project management needs. Program Evaluation Review Technique (PERT) and Gantt Charts are two of the most commonly used project management tools and are described below. Both of these project management tools can be produced manually or with commercially available project management software.[4]

PERT is a planning and control tool used for defining and controlling the tasks necessary to complete a project. PERT charts and Critical Path Method (CPM) charts are often used interchangeably; the only difference is how task times are computed. Both charts display the total project with all scheduled tasks shown in sequence. The displayed tasks show which ones are in parallel, those tasks that can be performed at the same time.[3] A graphic representation called a 'Project Network' or 'CPM Diagram' is used to portray graphically the interrelationships of the elements of a project and to show the order in which the activities must be performed.[2]

PERT planning involves the following steps:[7]

  1. Identify the specific activities and milestones. The activities are the tasks of the project. The milestones are the events that mark the beginning and the end of one or more activities.
  2. Determine the proper sequence of activities. This step may be combined with #1 above since the activity sequence is evident for some tasks. Other tasks may require some analysis to determine the exact order in which they should be performed.
  3. Construct a network diagram. Using the activity sequence information, a network diagram can be drawn showing the sequence of the successive and parallel activities. Arrowed lines represent the activities and circles or 'bubbles' represent milestones.
  4. Estimate the time required for each activity. Weeks are a commonly used unit of time for activity completion, but any consistent unit of time can be used. A distinguishing feature of PERT is it's ability to deal with uncertainty in activity completion times. For each activity, the model usually includes three time estimates:
    • Optimistic time - the shortest time in which the activity can be completed.
    • Most likely time - the completion time having the highest probability.
    • Pessimistic time - the longest time that an activity may take.

    From this, the expected time for each activity can be calculated using the following weighted average:

    Expected Time = (Optimistic + 4 x Most Likely + Pessimistic) / 6

    This helps to bias time estimates away from the unrealistically short timescales normally assumed.

  5. Determine the critical path. The critical path is determined by adding the times for the activities in each sequence and determining the longest path in the project. The critical path determines the total calendar time required for the project. The amount of time that a non-critical path activity can be delayed without delaying the project is referred to as slack time.

    If the critical path is not immediately obvious, it may be helpful to determine the following four times for each activity:

    • ES - Earliest Start time
    • EF - Earliest Finish time
    • LS - Latest Start time
    • LF - Latest Finish time

    These times are calculated using the expected time for the relevant activities. The earliest start and finish times of each activity are determined by working forward through the network and determining the earliest time at which an activity can start and finish considering its predecessor activities. The latest start and finish times are the latest times that an activity can start and finish without delaying the project. LS and LF are found by working backward through the network. The difference in the latest and earliest finish of each activity is that activity's slack. The critical path then is the path through the network in which none of the activities have slack.

    The variance in the project completion time can be calculated by summing the variances in the completion times of the activities in the critical path. Given this variance, one can calculate the probability that the project will be completed by a certain date assuming a normal probability distribution for the critical path. The normal distribution assumption holds if the number of activities in the path is large enough for the central limit theorem to be applied.

  6. Update the PERT chart as the project progresses. As the project unfolds, the estimated times can be replaced with actual times. In cases where there are delays, additional resources may be needed to stay on schedule and the PERT chart may be modified to reflect the new situation. An example of a PERT chart is provided below:

Benefits to using a PERT chart or the Critical Path Method include:[6],[7]

  • Improved planning and scheduling of activities.
  • Improved forecasting of resource requirements.
  • Identification of repetitive planning patterns which can be followed in other projects, thus simplifying the planning process.
  • Ability to see and thus reschedule activities to reflect interproject dependencies and resource limitations following know priority rules.
  • It also provides the following: expected project completion time, probability of completion before a specified date, the critical path activities that impact completion time, the activities that have slack time and that can lend resources to critical path activities, and activity start and end dates.

Gantt charts are used to show calendar time task assignments in days, weeks or months. The tool uses graphic representations to show start, elapsed, and completion times of each task within a project. Gantt charts are ideal for tracking progress. The number of days actually required to complete a task that reaches a milestone can be compared with the planned or estimated number. The actual workdays, from actual start to actual finish, are plotted below the scheduled days. This information helps target potential timeline slippage or failure points. These charts serve as a valuable budgeting tool and can show dollars allocated versus dollars spent.[4]

To draw up a Gantt chart, follow these steps:[1]

  1. List all activities in the plan. For each task, show the earliest start date, estimated length of time it will take, and whether it is parallel or sequential. If tasks are sequential, show which stages they depend on.
  2. Head up graph paper with the days or weeks through completion.
  3. Plot tasks onto graph paper. Show each task starting on the earliest possible date. Draw it as a bar, with the length of the bar being the length of the task. Above the task bars, mark the time taken to complete them.
  4. Schedule activities. Schedule them in such a way that sequential actions are carried out in the required sequence. Ensure that dependent activities do not start until the activities they depend on have been completed. Where possible, schedule parallel tasks so that they do not interfere with sequential actions on the critical path. While scheduling, ensure that you make best use of the resources you have available, and do not over-commit resources. Also, allow some slack time in the schedule for holdups, overruns, failures, etc.
  5. Presenting the analysis. In the final version of your Gantt chart, combine your draft analysis (#3 above) with your scheduling and analysis of resources (#4 above). This chart will show when you anticipate that jobs should start and finish. An example of a Gantt chart is provided below:

Benefits of using a Gantt chart include:[8]

  • Gives an easy to understand visual display of the scheduled time of a task or activity.
  • Makes it easy to develop 'what if' scenarios.
  • Enables better project control by promoting clearer communication.
  • Becomes a tool for negotiations.
  • Shows the actual progress against the planned schedule.
  • Can report results at appropriate levels.
  • Allows comparison of multiple projects to determine risk or resource allocation.
  • Rewards the project manager with more visibility and control over the project.

The Future

Project management tools have evolved from simple spreadsheet products to sophisticated, Web-based project information portals. The obvious trend in project management software, as with almost everything in information technology, is a move toward Web-based systems. Most project management tools can be accessed via browsers and those that do not currently have this capability are moving in that direction.[17] One product that allows users to take non-Web-based project management tools and to then bring the data to a Web browser is mesaVista from Mesa Systems Guild, Warwick, R.I. The product acts as a portal development tool that allows firms to view information from products such as Microsoft Project over the Web. These project management portals are becoming more common as the collaboration capabilities of project management tools improve.[9]

Another trend is the move toward hosted project management applications. For example, users can outsource project management to product/service offerings such as onProject.com from onProject.com Inc., Morristown, N.J., or WorkLenz from Metier Ltd., Washington D.C. onProject.com is an Internet workspace that allows users to share and mange information associated with projects and their related tasks. WorkLenz is a software application that serves as a virtual project manager with intelligent agent features. Offered via the ASP model, WorkLenz manages a customer's project and provides real-time alerts of issues, inefficiencies and problems, and even recommends solutions.[9]

Project management tools continue to evolve in terms of capabilities and user interface. The general direction is toward more integrated process and knowledge management systems, and user interfaces with a 'Web' look.[17] Project management tools are gradually becoming integrated project information portals with capabilities far beyond simple project tracking and reporting.[9]

As the sophistication of these products continues to grow, however, so too does their complexity. It is important for project management software vendors to keep things simple and easy to use. Project management tools should not become the focus of a project manager's life or add time to project activities. If a project manager has to spend too much time learning a product's features, their ability to actively manage the project process diminishes, totally defeating the purpose of the tool.[9]

References:

  1. 'Introduction to Project Management Skills'. http://www.mindtools.com/pages/main/newMN_PPM.htm. Last update time unknown. Accessed Nov. 2, 2002.
  2. The Numbers Group. 'Project Management'. http://www.snc.edu/socsci/chair/333/numbers.html. Last update time unknown. Accessed Nov. 4, 2002.
  3. 'What is Project Management?'. http://www.esi_intl.com/Public/projectmanagement/whypm.asp. Last update time unknown. Accessed Nov. 4, 2002.
  4. 'Project Management Techniques'. http://www.tifb.state.tx.us/Handbooks/Project_Management.htm. Last update time unknown. Accessed Nov. 4, 2002.
  5. 'Project Management Tools'. http://www.dbm.state.md.us/mdplan/apdx-bt.htm. Last update time unknown. Accessed Nov. 6, 2002.
  6. Georgia State University - CIS 330. 'Project Management'. http://www.cis.gsu.edu/~dtruex/courses/cis330/cis330PDF/wk7/ProjMgtp.pdf. Last update time unknown. Accessed Nov. 6, 2002.
  7. NetMBA. 'PERT'. http://www.netmba.com/operations/project/pert. Last update time unknown. Accessed Nov. 6, 2002.
  8. The Gantt Group. 'Using Gantt Charts'. http://204.144.189.70/index.htm. Last update time unknown. Accessed Nov. 6, 2002.
  9. Trepper, Charles H. 'A Project Management Primer'. http://www.aisc.com/us/lang_en/press_room/in_the_news/adtMag_August01.pdf. Last update August 2000. Accessed Nov. 6, 2002.
  10. Vanhooren, Axel. 'Project Management'. http://itprojmngt.8m.net/projman/pm_what.html. Last update time unknown. Accessed Oct. 31, 2002.
  11. Adams, John R. 'Principles of Project Management'. (c)1997 by the Project Management Institute.
  12. Craig, H Kent. 'PM 101: Assess Your Aptitude, Mindset, Potential.' Contractor. Sep. 2002. Vol. 49. Issue 9.
  13. Crawford, J Kent; Pennypacker, James S. 'Put an End to Project Management'. Optimize. Oct. 2002. Pages 73-78.
  14. Friedlein, Ashley. 'Web Project Management'. (c)2001 by the Presentation Company Limited. Morgan Kaufmann Publishers.
  15. Hartman, Francis; Ashrafi, Rafi A. 'Project Management in the Information Systems and Information Technologies Industries.' Project Management Journal. Sep 2002. Vol. 33. Issue 3. Pages 5-15.
  16. Hoffer, Jeffrey A; George, Joey F; Valacich, Joseph S. 'Modern Systems Analysis & Design'. (c)2002 by Pearson Education, Inc. Prentice Hall.
  17. Kioppenborg, Timothy J; Opfer, Warren A. 'The Current State of Project Management Research: Trends, Interpretations, and Predictions.' Project Management Journal. June 2002. Vol. 33. Issue 2. Pages 5-18.
  18. Payne, John & Shirley. 'Management Basics'. (c)1998 by the Adams Media Corporation.
  19. Quick, James Aaron; New, Cheryl Carter. 'Grant Winner's Toolkit: Project Management and Evaluation'. (c)2000 by Cheryl Carter New and James Aaron Quick. Published by John Wiley & Sons, Inc.
  20. Schimmoller, Brian K. 'The Changing Face of Project Management.' Power Engineering. May 2001. Vol. 105. Issue 5. Pages 28-30.
Project management tools are useful software pieces that aids project managers and their teams plan, organize, and manage their tasks efficiently. They help individuals meet their deadlines and produce fantastic work in the end. These tools come in a broad range of shapes and sizes and with their relevant software through which they can be accessed. There is a list of 8 useful project management tools for Gantt Chart, PERT chart, WBS diagram, calendar, timeline, status table, HOQ, and mind map. Learn the advantages of each tool and know how it works.


1. Project Management Software for Gantt Chart

A Gantt chart can help manage projects by breaking a large project into a series of smaller tasks in an organized way. Each task has an expected time duration, presented by a horizontal bar whose left end indicates the beginning date of the task and whose right end indicates the completion date of the task. Tasks may run sequentially, in parallel or overlapping. During the process, significant events can be highlighted as 'Milestones,' marked by small diamond shapes. Up uploader for instagram 3 7 download free.

You can recognize what the sub-tasks are and when each task begins and ends from a Cantt chart. Presenting a visual overview of the project, you can easily track the progress by seeing what should be happening at any stage in the project.

Software Recommendation

• Workzone

It comes with a broad range of powerful features but whose interface is more straightforward to use than other software in the market. This software allows you to create tasks and subtask dependencies, get quick access to statuses with Gantt charts, and assign more tasks per individual. You can also set permissions for specific users and create personalized to-do lists.

2. Project Management Software for PERT Chart

The PERT stands for 'project evaluation and review technique.' It's a primary project management tool for planning and scheduling entire projects and tracking the implementation phase. PERT charts can also show task division, time allocation, and starting and ending dates. Unlike the Gantt chart, which uses bars to represent tasks, the PERT chart displays information as a network model that uses boxes to represent tasks and arrows to present dependencies between tasks. The layout of a PERT chart makes the relationships between activities easier to see than with Gantt charts. But the disadvantage is it can be challenging to follow when there are many complex dependencies and tasks.

Software Recommendation

• Score

This is a comprehensive software that provides all the tools you may need for project management. It offers effective features such as Projects with sub-tasks and deadlines, a real-time KPI dashboard, time tracking and billing, detailed reports on project progress and finances.

3. Project Management Software for Calendar

The Calendar is the date or time-based project management tool, which is the easiest to understand. It is more suitable for personal time management better to manage your daily, weekly, or monthly schedules. The outstanding part of this tool is that it has more space for adding to-do lists. It will remind you what to do every day and make sure things can be finished before the deadline.

Software Recommendation

Management

• Teamweek

This is a time-based project software that enables teams to schedule their upcoming tasks and meetings into a common calendar. It comes with unique features such as simple project management, Gantt chart interface, scheduling work every hour, overseeing team members' availability, drag-and-drop task management. It is a simple add-on to more complex project management tools, thus making time-scheduling an easy task.

Things 3 5 1 – Elegant Personal Task Management Tools

4. Project Management Software for Timeline

The Timeline is also a visual project management tool to help track project progress. With a timeline, you can clearly visualize by what time a task needs to be done. It is a more sequential way of looking at tasks over time. However, the timeline is not as popular as the Gantt chart since it has limitations in showing task dependencies and the completion state.

Source: lucidchart

Software Recommendation

• Creately

This could just be the simplest way to work visually and collaborate with team members. The software allows you to draw anything and fast, from sketching out concepts, brainstorming plans to analyzing processes; team members can create tool timelines to track the progress and allocate deadlines to tasks.

5. Project Management Software for WBS Diagram

The WBS, also known as Work Breakdown Structure, is a common project management tool that helps visualize the scope of work by breaking a project into individual components that can be effectively scheduled. The WBS is a tree-style structure with the overall task on the top, followed by project sections and further into individual tasks. WBS examples are similar to a flowchart that has its components linked logically. The components may be explained in the text or the boxes.

Software Recommendation

• EdrawMax

Using EdrawMax, you can draw an effective WBS diagram using a set of professionally designed tools and easy-to-customize templates that come in large varieties.

6. Project Management Software for Mind Map

The mind map is also a powerful tool to manage your projects. Unlike other project management tools, the mind map is less formal, yet more flexible. You can use it to break the whole complex project into smaller tasks that are easy to manage to-do lists and analyze problems. With a mind map, you can insert pictures, link files, and drill down to focus on a specific part, which other tools couldn't do.

Software Recommendation

• MindMaster

This is a fantastic software that strives to help users draw professional-looking mind maps using built-in templates and share their creations with others through images or PDFs. It doesn't matter whether you're a student, entrepreneur, or office staff because, with MindMaster, you can plan your tasks and boost your creativity. It comes with cloud sync among different devices, rainbow color modes, drag and drop topics, relationship lines, and much more to explore.

7. Project Management Software for Status Table

The Status table is an effective tool that is used to track project progress. It doesn't contain too much detail of the project duration and task relations, but with more focus on the status and complete progress. A great function of the status table is that it can include people who take charge of the task, so that project leaders can better evaluate employee performance and know who to reach when there is a problem.

Software Recommendation

• EdrawMax

If you're looking for simplicity with professionalism, EdrawMax offers users professional tools that are easy to use; thus, allowing them to create outstanding status tables that are sure to effectively track the project's progress and outline the parts that need more work.

Things 3 5 1 – Elegant Personal Task Management Tool Download

8. Project Management Software for HOQ

HOQ, representing the house of quality, is a quality management tool used to define the relationship between customer desires and product capabilities. It's a tool used in QFD (Quality function deployment) to facilitate group decision-making. Though it looks complicated, it's easy to create through Edraw. All the components in the HOQ, like the roof, matrix, legend box, and markers, are already included in EdrawMax. You can create a high-quality HOQ diagram without much effort.

Software Recommendation

• Sick plan

This website planning system puts all the right tools at your fingertips. It provides you with an intuitive and elegant interface that allows you to focus on creating some of the best diagrams, including HOQ diagrams for your clients. Visualize the process and test scenarios by putting them into action with a Sick plan.


The Ultimate Management Tool: EdrawMax

If you're looking to create any of the above tools without having to switch between apps just to find the perfect project drawing software, then you can collect all your ideas and transform them into business reality with EdrawMax. This is an all-in-one diagramming tool with professionally designed symbols and customizable templates that allows you to create any project diagram you can think of.

Things 3 5 1 – Elegant Personal Task Management Tool Free

EdrawMax: a swiss knife for all your diagramming need

  • Effortlessly create over 280 types of diagrams.
  • Provide various templates & symbols to match your needs.
  • Drag and drop interface and easy to use.
  • Customize every detail by using smart and dynamic toolkits.
  • Compatible with a variety of file formats, such as MS Office, Visio, PDF, etc.
  • Feel free to export, print, and share your diagrams.


Conclusion

Project management involves effective plans and systematic work assignments. It includes determining the project objectives, making schedules, and assigning tasks to ensure that your team can accomplish a goal. Many tools make project management more effective and efficient. Here we will introduce the commonly used ones that are incredibly useful for visualizing your project. More importantly, all these diagrams can be made in EdrawMax, an all-in-one diagramming tool, which provides professionally designed symbols and multiple easy-to-customize templates. So you can create a diagram like a Gantt chart or WBS diagram with minimal effort.